Edmonton in 2010

Over the last few weeks I’ve been gathering links to articles, blog posts, and more related to Edmonton in 2010. I did something similar in 2009 and 2008. I’ll keep adding to this list as new stuff comes up.

Here are the articles and posts that I have found so far. Where it makes sense to do so, I have included an archive link:

Here are some other links related to Edmonton in 2010:

If you have another link to add to either list, let me know!

Thoughts on my Kinect for Xbox 360

I got what I wanted for Christmas! Santa, aka Sharon, gave me a Kinect for Xbox 360. It’s one of the hottest gadgets out there right now, and Microsoft expected to sell 5 million units by the end of 2010 (we might hear actual sales figures at CES this week). We’ve had fun playing with it over the last week, and it has proven to be a hit with friends and family too.

We have three games – Kinect Adventures, which came with the Kinect, Kinect Joy Ride, and Dance Central. I like different things about each, but I guess my favorite at the moment is Joy Ride. It’s really fun to steer, drift, boost, and stunt the car around the track! The interface seems to be the most touchy of the games, however. Adventures is also fun, but the downside is that it requires a lot of space in order for two players to play together. We have just enough space in our condo after we slide the couch out of the way. Dance Central is probably the most well-known Kinect game, and it is more or less what you’d expect from the makers of Guitar Hero and Rock Band. It’s fun, as long as you’re not afraid to look ridiculous! It also has a really attractive interface, with Minority Report-style swiping, rather than holding your hand stationary to select as in the other two games.

I have to admit, the Kinect is much more of a workout than I anticipated. There is no sitting down! If you play long enough, the Xbox actually pops up a notification asking if you need to take a break.

Kinect Joy Ride

One of the best parts about Adventures, Joy Ride, and Kinect Sports (which we don’t have), is that each game takes photos as you play. Some of them are just embarrassing! But they are fun to look at, and you can upload the photos to KinectShare.com, where you can download them or share them on Facebook. It looks as though that was built specifically for Microsoft’s games, but it would be fun to see it extended Kinect-wide (or better yet, just let me upload straight to Facebook or Flickr).

The picture above is pretty low quality, but I am guessing that is just to save space/bandwidth, because the quality of video using the chat feature is impressive. Sharon and I did a video chat on the Kinect with my parents who used a normal computer with Windows Live Messenger, and it worked flawlessly. Made me wish for Skype support on the Xbox (as that is where the majority of my webcam contacts are).

Another interesting feature of Kinect is the voice recognition. So far it seems to listen to Sharon better than it does to me, but either way it does a decent job of interpreting commands even with background noise. The downside is that it is limited to the “Kinect Hub” – a kind of mini-dashboard within the Xbox 360 dashboard. I look forward to broader voice support, so that I can tell my console to turn off, or launch Netflix.

I love the Kinect, so far! It’s hard to believe that the device I stood in line for over five years ago has changed so dramatically, but it has. And I can’t help but think that this is just the beginning. There’s so much you can do with a Kinect-style interface, and I can’t wait to see what comes next.

Thanks Santa!

Top 10 Posts for 2010

Last year I posted a list of the top ten Edmonton posts written in 2009 on my blog by views and counts. I figured I’d do the same this year, with the top posts written in 2010.

Here are the top ten individual posts by views:

  1. Why Edmonton’s Teatro La Quindicina and actor Jeff Haslam will never get my business again
  2. Who’s behind Envision Edmonton?
  3. Alberta Budget 2010 website – security through obscurity
  4. Edmonton Neighbourhood Census Data
  5. Edmonton’s future leaders
  6. Open Data and Municipal Election Results
  7. Sneak Peek at the new Art Gallery of Alberta in Edmonton
  8. Edmonton Election 2010: Final Mayoral Forum Recap
  9. Edmonton’s Hot to Huddle 2010 Grey Cup Festival Kick-off!
  10. Edmonton City Centre Airport Design Competition Finalists

Of course, many people read via RSS or by simply visiting the home page which means its nearly impossible to know which post was actually the most read. That list is probably fairly close though.

Here are the top ten posts by comments. As expected, there is quite a bit of overlap:

  1. Who’s behind Envision Edmonton?
  2. Why Edmonton’s Teatro La Quindicina and actor Jeff Haslam will never get my business again
  3. Timeraiser returns to Edmonton with a WestJet giveaway!
  4. Sneak Peek at the new Art Gallery of Alberta in Edmonton
  5. Edmonton’s future leaders
  6. Edmonton Public Schools & Open Data
  7. Edmonton Neighbourhood Census Data
  8. Pecha Kucha Night: Edmonton #6
  9. Start offering bus service to EIA from Century Park!
  10. Alberta Budget 2010 website – security through obscurity

Thank you for reading and commenting this year! I’m looking forward to 2011.

An impressive collection of local stories: 30 Days of Edmonton

For the last month, I’ve been following along as Amanda Dunlop has profiled one local business each day on her blog. She called it 30 Days of Edmonton, and it is an impressive collection of local stories. Each entry contains a brief interview with the business owner and some wonderful photos, which is no surprise given that Amanda is the primary photographer behind Lightside Photography. I liked the series so much that I asked Amanda for an interview (over coffee at Credo, which she profiled on day 15).

Amanda Dunlop

Born and raised in Edmonton, Amanda’s story is similar to many others – it took leaving to see other parts of the world to truly appreciate what we have here in Edmonton. And as she learned more about the city, her appreciation grew. Amanda worked in the Edmonton Journal’s ad department for a time, but it wasn’t her passion. She has been a photographer for more than five years, and just last fall took the plunge and made it her full-time gig.

I asked Amanda where the idea for the blog series came from, and she said it all started with a conversation. Her friend and fellow photographer Matt Ramage was setting up his business in Saskatoon, and the two discussed ways for a new business to get noticed. The idea of photographing local businesses grew from there, and Amanda ran with it (Matt may do a Saskatoon version still). She realized that the series could be a “fun and casual” way to spread the word about local establishments, and to share why she chooses to shop local.

Though she started with a “cheat sheet” of canned questions, Amanda told me they quickly evolved as she realized that some worked and some didn’t, depending on the business. She had been to most of the places she profiled at least once before, but there were some new ones, and she always made a point of asking the business owners she talked to for their favorite places. Good thing too – Amanda started with just three businesses lined up!

Amanda had three questions that I was always eager to see the responses to. Here are a few examples.

Did you grow up in Edmonton, or are you a transplant? If so, what brought you here? What keeps you here?

I never had any intentions of staying…I don’t think most people who grow up here do. I was thinking of moving to Toronto and then this opportunity came up where I was working here and was able to purchase the business from the current owner. So I went for it and I’ve really grown to appreciate Edmonton a lot more. Traveling to other cities has also made me appreciate what Edmonton has.
– Jessica, Nokomis Clothing, Day 2

I consider Edmonton my home and we just wanted to come home. It’s got some pros and cons. It’s quiet and less pretentious than a lot of cities, yet the people are good and they tend to be a little more adventuresome and quite trendy. On the other hand it’s a little hard to get some nicer things here like fresh seafood and fresh produce, etc.
– Dennis, Chocolate Exquisite, Day 11

This street is Edmonton’s idea of what downtown revitalization should look like. The people are just so supportive as well and when people start talking you really see it in the amount of business that comes in.

– Geoff, Credo Coffee, Day 15

Why is it that people are so hesitant about shopping local? Why do you think Edmonton is so “Big Box” in general?

I think Canadians are sometimes unsure of who they are and they’re not as proud of local product as much as say someone from Italy. A lot of people just don’t know what amazing quality we have right here.
– Karen, C’est Sera, Day 12

I think it’s harder and it’s an unknown. When you walk into a mall all of the stores look pretty much the same. When you walk into a local independent you never know what it’s going to be like. I think it can be a little scary. So that can be a negative thing if you want the same thing all the time, but if you want variety small independents are what you want.
– Jessie, The Blue Pear, Day 14

The city has become a mall and big box dependent culture, partly due to the near collapse of downtown. It seems that once you’ve lost your downtown, you may have lost your city. Edmonton is also a car oriented city. Because of this people tend to not shop in their local communities. Independent shops are often an overlooked part of what makes a unique community.
– James, Stylus, Day 24

If you could see one thing change here what would it be?

What my husband and I have been trying to do is to go to a butcher and get our meat, and then go to a baker and get our bread, and so on. I’d just like to see a section of the city created where you can do that with a little more ease. I guess I would like to see it become a little more European and walkable.
– Rychelle, Red Ribbon, Day 9

I guess I am seeing the change with what has been happening downtown. We’re becoming more community oriented and less big box and you don’t have to drive as much. I guess I’d just like to see us move a little further towards what we see in Europe. I think people want to feel involved in their community and that’s what we need.
– Chad, deVine Wine and Spirits, Day 13

I’d like to see people complain less…it’s one thing that drives me crazy here. I would consider Edmonton in general to have one of the best standards of living in the country. It’s just unfortunate that many of the people who live here seem to be so unhappy with it. There’s just a disproportionate amount of people that just seem to be looking for something to complain about even when this is a really great city.
– Jay, Happy Harbor Comics, Day 20

Not every business answered every question, but I still think it’s fascinating that so many different small business owners in Edmonton had such similar answers to those three important questions. Most felt that Edmonton doesn’t get the credit it deserves, that shopping local is often overlooked even though it really makes communities unique, and quite a few cited transportation and becoming “more European” as key things they’d like to see change. I also really loved Jake’s answer on Day 6 about what he’d like to see change:

The drab colours…imagine if no one here was allowed to paint their house white or brown. Things would be so much more colourful here in the winter.

That’s an idea I could get behind! The “smartie pack” houses (as we called them) in Inuvik were unique and anything but boring.

I asked Amanda if there were any businesses she would have liked to have profiled but didn’t, and she said “definitely”. She quickly realized there were far more businesses than one could cover in just 30 days! Amanda said she wished she had been able to do a few more “boy stores” like pubs or a maybe even a paintball place.

Amanda Dunlop

Amanda told me she has “a newfound respect for reporters and writers” – she discovered the series was much more time consuming to produce than she had originally anticipated! She estimates she spent two to three hours on every post, and that was on top of her regular obligations, of course. It was rewarding however, and she’d like to continue it – but less intensively, perhaps one or two profiles per month.

I had a great conversation with Amanda, and was happy that the passion for local she shared on the blog came through in person too. She was wearing a top designed by Edmonton’s own Fridget Apparel, and admitted she was “devastated” by the news that Nokomis was closing. “If I was having a bad week I’d go to Nokomis and buy a dress,” she told me. Amanda’s other local favorites include Blue Plate Diner (which she profiled on day 27), and Red Ribbon (which she profiled on day 9). “We need the dynamic that local business brings to the community.”

The final entry in the series will be posted tomorrow. I encourage you to read through all of the profiles.

Well done Amanda, and thanks for the chat!

Alberta’s Community Revitalization Levy: Rivers District, Belvedere, The Quarters

This is the second part in a three-part series on Alberta’s CRL.

Armed with a better understanding of Alberta’s CRL legislation, I turned my attention to the three active CRL projects in the province. What are the projects for? Why is a CRL appropriate for them? What can we learn from the projects that will help us when exploring the idea of using a CRL in the future? That’s some of what we’re going to look at in this post.

To quickly recap the process: there is some back-and-forth between the city and the province in establishing a CRL. First, the Lieutenant Governor must approve the regulation, which includes the CRL boundary. Second, City Council must approve the plan & bylaw for the CRL (and these can be done separately). And finally, that plan & bylaw must also be approved by the province. The three projects we’re going to look at are at different stages of that process.

Calgary’s Rivers District

The first specific CRL regulation to be passed in Alberta was for the City of Calgary Rivers District, back in 2006. The Rivers District project was the catalyst for the MGA amendment that made CRLs possible in Alberta.

 City of Calgary Rivers District Community Revitalization Levy Regulation (AR 232/2006)

The Rivers District is the furthest along of all the CRLs in Alberta – everything has been approved and the City is well into implementation. It was 2007 when everything was finally approved, so the baseline for tax assessments would have been frozen to the values on December 31, 2007.

It’s worth pointing out that the CRL is just a small part of a much larger project known as The Rivers:

The vision for a revitalized Rivers district is more than a place to live, it is a lively urban destination.

This map shows the area the project covers, and as you can see, it is quite expansive. The idea is to reclaim the waterfront, and to make the area more desirable for development. In addition to infrastructure upgrades, a new riverwalk is in the works (phase 1 is now open actually).

The CRL boundary is large, but it is a small part of the overall project. Here’s what it looks like (KML):

The boundary covers an area of roughly 1.9 square kilometers (478 acres).

One of the big advantages to using a CRL for the Rivers District is that the City of Calgary owned much of the land within the boundary. That’s important because it means the baseline assessment for those assets would be zero, and there’s lots of potential for getting some of that all-important lift.

I spent some time talking with Kathleen Young, Development Manager for The Quarters Downtown at the City of Edmonton, and found out that she actually worked on the Rivers District CRL! Her knowledge and experience on that project was one of the reasons that she came to Edmonton. You know what they say, it’s a small world.

Kathleen pointed out that the CRL boundary for the Rivers District includes some key developments, notably The Bow (here’s a photo of the building I took back in July). When finished, The Bow will become the headquarters for EnCana, and will be the tallest office building in Canada outside Toronto. Groundbreaking for the project took place in June 2007, around the same time that the Rivers District CRL was approved, which means almost all of the incremental value realized through the development of the building will be captured by the CRL.

To work on The Rivers, the City of Calgary created a wholly owned corporation called the Calgary Municipal Land Corporation (CMLC). They have some great information on the various aspects of the project if you’d like to learn more. CMLC was actually awarded a Canadian Urban Institute Brownie Award in 2008 for the CRL:

The Canadian Urban Institute’s annual Brownie Award recognizes leadership, innovation and environmental sustainability in brownfields redevelopment across Canada. CMLC won in the category of "Financing, Risk Management and Partnership" for our work in the creation of the Rivers District Community Revitalization Levy Regulation. A "made in Alberta" version of the U.S. Tax Increment Financing (TIF)— which is a widely used financing mechanism for redevelopment of brownfield sites in the United States—provides a sustainable source of funding to finance the significant infrastructure development required in the Rivers District for a 20-year period.

It sure looks like the Rivers District CRL will be a success!

Belvedere (Fort Road)

The first CRL regulation to be passed for Edmonton was for the Belvedere redevelopment project, commonly known as the Fort Road Redevelopment project. The project has been in the works since at least 2000, and has evolved quite a bit over the last decade. It was very much in the works before CRL legislation came into effect.

 City of Edmonton Belvedere Community Revitalization Levy Regulation (AR 57/2010)

The Belvedere CRL isn’t quite as far along as the Rivers District, but it is nearly there. Kathleen clarified that the borrowing bylaw (14883) has been approved, but the plan bylaw is still in the works. Armed with the $34,250,000 specified in the borrowing bylaw, the City has undertaken much of the infrastructure upgrades planned for the area.

Here’s the CRL boundary for the project (KML):

The boundary covers an area of roughly 1.3 square kilometers (324 acres).

A unique element of the Belvedere CRL is that the City owns almost all of the land within the boundary. As a result, when they sell the land all of the incremental value will be captured by the CRL, making it much less likely that the City would have to fall back on general revenue to cover the debt.

The Belvedere project is an interesting one. It is unlikely that development would have taken place in the area without the City of Edmonton stepping in to try to make the area more attractive and desirable. Through that lens, the use of a CRL makes a lot of sense. If you think back to the two basic assumptions highlighted in part one, the Belvedere CRL certainly passes the first – it’s worth the risk.

As for the second assumption – there’s a sound expectation that development will occur – that one is less certain. Especially given the challenging economy, it could be a while before anything substantial happens. Having said that, the first sale of the Station Pointe lands last year for $5.2 million is hopefully a sign of things to come (that project received $481,000 in federal funding in August). The redevelopment project is still in the early stages, and Rick Daviss at the City of Edmonton confirmed that at least a couple new conditional deals are in place, so there’s movement.

There’s more information on the Station Pointe project here – it won a Brownie Award in 2008.

You can find lots of background and other information on the Fort Road redevelopment project here.

The Quarters

The newest CRL regulation to be passed was for The Quarters Downtown, a redevelopment project here in Edmonton previously known as the Downtown East redevelopment. I wrote about The Quarters a couple weeks ago, and I’d encourage you to look at that post to get an overview of the project.

 City of Edmonton The Quarters Community Revitalization Levy Regulation (AR 173/2010)

As the newest CRL project, The Quarters has the furthest to go before it is ready for implementation. The province has approved the regulation and boundary, and Administration is now working on the plan and bylaw to present to Council. That will happen sometime in 2011, according to Kathleen. Her team wants to make sure they get it right.

Here is the CRL boundary for the project (KML):

The boundary covers an area of roughly  0.93 square kilometers (229 acres).

The Quarters is a large plan that will proceed in phases. Once completed, it is anticipated that the area will accommodate a population of nearly 20,000 people, up from less than 2500 today. The project is made up of five distinct districts, the jewel of which is known as The Armature.

An important part of any CRL plan is the way in which the City will cover the cost of the project if enough development does not occur. The default fallback is always general revenue, but Kathleen said they are looking at additional funding sources as well, such as government grants.

Kathleen told me that among other things, some of the CRL money will be used for streetscape improvements, some will be used for land acquisition to consolidate parcels for resale, and lots would be used to develop The Armature. The goal is to make that part of Edmonton a much more livable area, and the redevelopment focus is on residential assets.

As I have said before, it is an exciting project for our city! You can learn more about The Quarters Downtown here.

The project will be an interesting one to pay attention to if you’re interested in CRLs, because there are still a number of steps in the process to go.

Final Thoughts

If you’ve made it this far, you should now have a better understanding of the three active CRL projects in Alberta. You can draw your own conclusions, but a few things I wanted to highlight include:

  • All three boundaries are similarly sized
  • Infrastructure upgrades and improvements are a major part of all three projects
  • In the Rivers District and Belvedere, and to a lesser extent in The Quarters, an important consideration is the amount of City-owned land

I think it is important to look at what we already have when trying to understand how a CRL could be applied to future projects. In the next part of the series we’ll do just that, using the proposed downtown arena as our future project.

Alberta’s Community Revitalization Levy:

  1. Introduction
  2. Rivers District, Belvedere, The Quarters
  3. Proposed Downtown Edmonton Arena District

Alberta’s Community Revitalization Levy: Introduction

This is the first part in a three-part series on Alberta’s CRL.

Recently I decided to start learning more about Alberta’s Community Revitalization Levy (CRL), and I was initially struck by how little information was readily available. I searched and searched but didn’t find much. Maybe that’s because what we call the community revitalization levy here in Alberta is known as tax increment financing (TIF) elsewhere. It turns out that TIF has been available as a public financing method for more than 50 years! The State of California first used the approach in 1952, and now Arizona is the only state in the USA without some sort of TIF legislation.

Here’s how Wikipedia describes TIF:

When a development or public project is carried out, there is often an increase in the value of surrounding real estate, and perhaps new investment (new or rehabilitated buildings, for example). This increased site value and investment sometimes generates increased tax revenues. The increased tax revenues are the “tax increment.” Tax Increment Financing dedicates tax increments within a certain defined district to finance debt issued to pay for the project.

The idea is to use the “lift” generated by the increased tax revenues to pay for the debt that financed the project.

Alberta’s CRL

In Alberta, this legislation is relatively new. Bill 28 received Royal Assent on May 10, 2005 and amended the Municipal Government Act (PDF) to include Division 4 under Section 381, which enables municipalities to create a community revitalization levy bylaw (which must be approved by the Lieutenant Governor in Council).

Since that legislation came into effect, there have been three CRLs created in Alberta (as far as I can tell): Calgary’s Rivers District, the project for which Bill 28 was created, and the Belvedere (Fort Road) and Quarters redevelopment projects here in Edmonton. You can read more about all three projects in part two.

There are a few key aspects of the CRL to be aware of:

  • The CRL only applies to a very specific area (the CRL boundary).
  • The tax revenue that contributes to the CRL is split between the City and the Province.
  • The maximum amount of time a CRL can exist is 20 years, starting in the year when the bylaw is approved by the Lieutenant Governor in Council.
  • The Lieutenant Governor in Council can approve a CRL bylaw in whole or in part or with variations and subject to conditions.

And don’t be mislead by the name “levy” – the CRL is a tax as defined in the MGA. It’s a funding mechanism, nothing more.

From my read of the Municipal Government Act, there are no rules or restrictions on the type of area that a CRL can apply to. In theory a CRL works best in an area that is “blighted” but the legislation does not enforce this. This was the case in California as well, until it became clear that the legislation was being abused.

What’s the potential impact of a CRL?

I asked Rick Daviss, Manager of Corporate Properties at the City of Edmonton, to help me understand the CRL. He was very helpful and pointed me in the direction of some very useful information.

The first thing we looked was a hypothetical example of the impact of a CRL. Here’s the situation:

  • Current use: 2.0 acre parcel of land improved with a 30,500 square foot warehouse.
  • Proposed use: 2.0 acre parcel of land improved with a high rise residential condo development (proposed density of 265 units (RA9), FAR of 3.0, unit value assessed at $200/square foot).

So we’ve got an old warehouse on some land and we want to replace it with a condo. Let’s look at the assessed value:

  • Current use: $1,525,000 (this is known as the assessment baseline)
  • Proposed use: $44,431,200

Which gives us an increase in value of $42,906,200. Now let’s look at the tax assessment:

  Before After Difference
2006 Municipal Mill Rate 5.7484 5.7484
2006 Municipal Tax $8,766 $255,408 $246,642
2006 School Mill Rate 3.6182 3.6182
2006 School Levy $5,518 $5,518 $0
2006 CRL N/A $155,243 $155,243

The mill rate is used to calculate the property tax, and you can think of it as the amount of tax required divided by the amount of tax available. So if the City needs $2 billion in taxes but only $1 billion can be generated based on the assessments, the mill rate is 2. The property tax is then calculated by multiplying the assessed value by the mill rate, and dividing by 1000. So to get $8,766 in our example above, $1,525,000 is multiplied by 5.7484 and then divided by 1000.

Let’s look at the Before column first. The total tax assessment there was $14,284, and the two bottom rows are N/A because we don’t have a CRL in the before case. Both the City and School taxes are calculated the same way: assessed value multiplied by the mill rate divided by 1000. The province gets $5,518 and the City gets $8,766, all of which goes into what’s known as “general revenue”.

Now let’s look at the After column. The total tax assessment there is $416,169. The City tax is calculated the same as before, but now that we have a much higher assessed value, we end up with $246,642 in increased tax revenue. All of this will go to the CRL. The School tax is broken into two, because only the incremental tax revenue will go toward the CRL. So the $5,518 is calculated the same as in the Before case, and this goes to the province. The provincial part of the CRL is calculated as follows: the increase in assessed value ($42,906,200) multiplied by the mill rate divided by 1000. That gives us the $155,243, all of which will go the CRL.

So now you see why the CRL is such an attractive proposition: it looks like we have $401,885 in new tax that we can contribute to the CRL. And this could happen with all developments inside the CRL boundary. There are a number of caveats, however. The first is that the CRL amount will vary from year to year based on the assessment (which makes the economy and depreciation relevant) and on the school mill rate which also changes from year to year. The second is that the type of development is important – City owned properties are tax exempt, for instance. A third is that the City tax revenues as well as a portion of the School tax revenues are dedicated to the CRL, where they would otherwise have gone into general revenue.

How is a CRL created?

Rick walked me through the process of creating a CRL, and I can tell you it sure doesn’t sound like a trivial task. In the best case, Rick estimates it would take just less than two years from concept through to the start of implementation to make a CRL reality. Here’s a high-level overview of the process:

Those five steps would include, roughly:

  1. Administration conducts background research, identifies the potential boundary, comes up with preliminary revenue estimates, and prepares for and asks Council for approval to make a request to the Minister of Municipal Affairs.
  2. The Minister of Municipal Affairs considers the request and recommends an Order in Council for an establishment regulation. This step also includes some back and forth to establish the area and other parameters.
  3. The Lieutenant Governor in Council considers and approves the Order in Council for the area to be established.
  4. Administration conducts more research, holds public hearings, drafts the proposed bylaw, has it reviewed by all relevant departments as well as the province, and acquires Council approval of the bylaw.
  5. The Lieutenant Governor in Council approves the bylaw.

After all that is done, the CRL can proceed. It makes sense to plan for the Lieutenant Governor in Council’s final approval as close to the start of construction as possible, in order to get the maximum possible time under the CRL legislation.

What are the risks associated with a CRL?

As others have pointed out, a CRL is not a risk-free proposition. There are a number of issues to consider.

What if a project does not lead to an increase in property values and does not result in any new development? In this case, there would be no “lift” to pay down the debt of the project. Rick noted that a plan for this kind of scenario needs to be in place before the province will approve a CRL. It can be as simple as the City swallowing the cost of the project, as long as it can specify how it will be paid for. Another option is for a third party to backstop the plan.

Another issue is the potential shift in taxes. Will the project really result in new development – development that would not have occurred in the city otherwise – or is it merely a shift in development, from areas outside the CRL to the area inside the CRL boundary? How would you know, one way or the other?

A related issue is the decrease in general tax revenue. If the property tax inside the CRL boundary is no longer going into general revenue, what does that mean for the services the City provides? In the worst case, you can imagine the entire City being covered in various CRL projects. That would result in zero general tax revenue and thus no way for the City to pay for the services it provides to citizens. What is the impact of one or two CRL projects? That’s less clear. Same goes for the school taxes. A common concern for many people is that they don’t want their school taxes going toward the CRL instead of schools. Of course, in reality the province doesn’t come up with education programs based on the amount of school tax it receives – tax revenue does go into the Alberta School Foundation Fund, but that money is combined with whatever amount of general revenues the province deems appropriate.

Can a CRL really work?

For a CRL to work, Rick says you need to make two basic assumptions:

  1. The project the CRL would be funding is a good thing, and is worth the risk.
  2. There’s a sound expectation that development will occur as a result.

If you think the project is worth the risk, and you’re confident that development will occur as a result of taking that risk, then a CRL can be a good funding source. Rick highlighted the Belvedere (Fort Road) project as meeting this basic criteria: it’s an area that needs to be redeveloped and it’s unlikely that anything would happen without some initiative by the City, plus there’s a good chance that other development will occur now as a result of the City going in and cleaning things up.

Final Thoughts

If you’ve made it this far, you should now have a better understanding of how Alberta’s Community Revitalization Levy came to be, how it works, and what the potential impacts and pitfalls of the legislation are.

In the next part of this series, we’ll look at Alberta’s three current CRL projects in more detail.

Alberta’s Community Revitalization Levy:

  1. Introduction
  2. Rivers District, Belvedere, The Quarters
  3. Proposed Downtown Edmonton Arena District

Northlands by the numbers

Today Northlands made a presentation to City Council. Chair Andrew Huntley and President Richard Andersen talked about the impact that the organization has in Edmonton, and answered questions related to the proposed downtown arena. Here’s an at-a-glance look at Northlands:

Most of those numbers come from the 2009 Northlands Annual Report (PDF). Northlands breaks its business into four areas: Northlands Major Events, Agriculture, Racing and Gaming, and Sales, Hospitality and Client Services. Racing and Gaming accounts for both the most revenue and the most expense – that area of the business lost over $7 million in 2009.

As David Staples noted, I don’t know how they get to 2500+ events.

Some other numbers, from the presentation this morning:

  • $5.8 million is the base cost of operating Rexall Place each year
  • $10.9 million is the cost of operating Rexall Place if you include hockey
  • $17.1 million is the cost of operating Rexall Place after including all other events
  • $1.1 million is the amount the Oilers contribute towards those operating costs
  • $2.2 million is the amount the City of Edmonton contributes toward those operating costs each year (adjusted for inflation)

The Oilers pay Northlands $1 to rent Rexall Place – that agreement is set to expire on June 30, 2014. Northlands pays the City of Edmonton $1 to rent the land its facilities are located on – that agreement is set to expire in 2034.

You can learn more about Northlands here, and you can see their answers to City Council’s questions here (PDF).

Using Disqus for Comments

Today I switched the comment system for this blog to Disqus (“discuss”). You’ve most likely already used Disqus on other websites even if you didn’t realize it – they reach over 200 million people each month. Disqus is used by CNN, Fox News, TechCrunch, and many other popular websites. Their reach is all the more impressive when you consider that the company only started in 2007. Here’s how Disqus introduces itself:

DISQUS is a comments platform that helps you build an active community from your website’s audience. It has awesome features, powerful tools, and it’s easy to install.

There are a number of features that Disqus provides that are quite compelling. As a blogger, you get threaded comments, inline media embedding, social integration, mobile support, email support, and much more all “out of the box”. All of that is now available here, on this blog.

Installation was simple – just download the plugin, activate it, and login. One of the primary reasons I felt comfortable switching to Disqus was its integration with WordPress. All new comments will appear in both Disqus and my WordPress database, which means I can remove Disqus at any time without losing any data. All existing comments are now in Disqus too. That process was somewhat trickier – the automatic importing didn’t work properly for me, so I had to manually export some comments from WordPress, and then import them into Disqus. Even that didn’t take much effort though.

Disqus also has really simple integration with Tumblr, so I am using it for comments on my Edmonton Etcetera blog as well.

You can learn more about Disqus at their blog. If you’re a developer, check out the API documentation (I’ll be looking into that more).

Hope you enjoy the new comment experience here!

Quarterly Update on the City Centre Airport Redevelopment

Today the City of Edmonton provided an update on the City Centre Redevelopment. Phil Sande, the project’s executive director, gave a brief overview of the report (PDF) that will go to Council on Friday, and was available to the media for questions. As you can see, the project now has a logo!

Phil talked most about the process for the design competition. Submissions from the five finalists are due on January 21, 2011, and are to contain display material, a five-minute video, and written content. Each finalist must also make a case for why they should be chosen. Here are the updated dates:

  • January 21, 2011: Submissions from finalists due.
  • January 24/25, 2011: Submissions should be available to the public online.
  • January 28 – February 6, 2011: Submissions will be on display at City Hall (and other locations).
  • February 8-10, 2011: Selection Committee will review the submissions and interview each team.
  • March 2011: Recommendation from Selection Committee will go to City Council.
  • April/May 2011: Winning submission selected and contract negotiations begin.

The winning submission will then undergo a 15 month “master plan process” which will include extensive public involvement. After that process is complete, the City will have more reliable numbers for both number of residents and potential tax revenue from the redevelopment. Tenders for construction of the first phase of the project could go out as early as the summer of 2013, with utility work beginning around the same time.

Phil Sande, CCR

There’s an update on the environmental analysis in the report:

The Phase II Environmental Site Assessment on the east portion of Edmonton City Centre Airport site identified three locations where there are contaminants above acceptable criteria. A risk management approach is being applied to these sites, which means no remediation is necessary until such time as the site is redeveloped.

There were lots of questions about the updated revenue estimates for the redevelopment. Here’s what the report says:

Based on current development practices, upon full build out, preliminary estimates suggest that the City Centre Redevelopment will generate annual tax revenues in excess of $20 million per year and generate net sales revenues in excess of $70 million.

Phil stressed that we’ll have better information after the master plan process, and that the estimates are conservative and very approximate. He cited a change in parameters (notably the amount of land set aside for institutional use, and an increase in the amount of residential use and thus a decrease in the more lucrative commercial space) as contributing to any differences from previous estimates.

Here’s what Economic Impact Analysis (PDF) from June 2009 said:

The overall benefit to the City of Edmonton resulting from redevelopment of the ECCA lands is estimated to total $93 million (2009 $ net present value over 35 years using a 10% discount rate).  This benefit is expected to range between $55 and $168 million when the discount rate applied to future costs and revenues is varied by ±3%.

You can find all the other relevant documents here. It’ll be interesting to see how these numbers change as we learn more, but right now, they don’t seem that far off from where we were at last year.

Phil said that the redevelopment is still a vitally important project for the City of Edmonton, one that will bring a number of benefits to Edmontonians. His team has not received anything from the finalists in the design competition just yet, but it sounds like they are hard at work. I look forward to seeing what they have come up with in January!

UPDATE: Here’s a PDF document that outlines the range of redevelopment opportunities as they were envisioned in 2009. The net revenues of the options range from $91 million to $486 million.

UPDATE2: Another update from the City, received this evening:

Previous estimates of City revenues ranging from $91M to $486M remain accurate. These are based on the City acting as developer in four possible redevelopment scenarios. The anticipated revenue from the sale of the land as reported in the update is $70M. This number is based on the City selling the land to a developer, rather than acting as the developer itself, as is intended. The option for the City to simply sell the land was not one of the previous four redevelopment scenarios, and should not have been included in the quarterly update report. It is not an option the City is considering.