NorQuest’s downtown expansion rises

Two more cranes joined the downtown skyline recently as construction on NorQuest’s new Singhmar Centre for Learning heats up. The new facility will be located immediately north of the current NorQuest campus along 103 Avenue between 107 Street and 108 Street (Capital Boulevard). It’s the first major project for NorQuest in roughly 50 years, and when it opens in 2017 it will bring enrollment in the college to over 12,500 students with the goal of doubling the current student population to 20,000 by 2025.

NorQuest Construction

The Province is contributing $170 million to the project, with another $15 million coming through NorQuest’s Maximizing Opportunities campaign. That campaign received a major boost in November when Dr. Prem Singhmar and Dr. Saroj Singhmar contributed $2.5 million to the project, which is where the name came from.

NorQuest Construction

The details are subject to change of course, but current plans would see 24 classrooms, 24 labs, and 3 “flex” classrooms built in the new facility. It would become the college’s main academic building and will serve students studying in a variety of subjects, everything from health care to English as a second language. The Singhmar Centre will also feature a daycare, a new library, food services, and plenty of meeting and activity space. Underground you’ll find parking for about 100 vehicles and 75 bicycles.

NorQuest Singhmar Centre for Learning

The existing main building isn’t going anywhere but will be receiving significant renovations, slated to be complete in 2018. The smaller Health Education Centre building on the corner of 102 Avenue and 107 Street will be demolished at some point after the expansion opens. When the entire project is done, it’ll offer not only important new learning space for NorQuest students, but also plenty of publicly accessible green space too. It’s great to see another giant downtown parking lot disappear!

Expectations for a modern college

The existing downtown campus opened in 1971, when both educators and students had very different expectations than they do today. The new campus should help NorQuest to keep up-to-speed with the changing technology requirements (and knowledge) of its students and staff.

NorQuest Singhmar Centre for Learning

About 89% of students have a smartphone, 52% use a tablet, and 95% have access to high speed Internet, and those numbers are only going up. Lots of students choose NorQuest in order to prepare for their careers, which these days always involves technology. I’m looking forward to learning more about what technology features the building will have.

A diverse student population

Based on the 2013-2014 academic year, about 75% of NorQuest students are from the Edmonton region, but 60% were born outside of Canada, representing around 90 countries. There are nearly 70 languages spoken on the NorQuest campus!

NorQuest Singhmar Centre for Learning

Approximately 11% of NorQuest’s student population are Aboriginal (First Nations, Metis, or Inuit ancestry). That’s one of the reasons why the college is so excited about the Aboriginal ceremonial room that the new campus will feature. The centrally-located and inviting room will be overseen by one of NorQuest’s elders-in-residence.

As Edmonton’s Aboriginal population continues to grow, NorQuest is looking forward to contributing to the success of that community. They recently launched a two-year pilot project in conjunction with Bow Valley College to help more than 600 Aboriginal people train for careers in the construction industry.

Connected to the LRT

With the Valley Line LRT slated to run right up 107 Street beside the campus with a stop just south of 104 Avenue, NorQuest will become connected by train to MacEwan, NAIT, and the University of Alberta.

As mentioned, NorQuest’s student population is very diverse. With a large number of newcomers, who NorQuest says typically rely on transit, being so close to the LRT will be key for remaining competitive in the future. In fact, 69% of NorQuest students cited “location” as an important factor in their decision making, and having the LRT there will make the decision that much easier.

A window into the construction

I believe the Singhmar Centre for Learning is one of the first downtown construction projects to feature the “E” window that was unveiled back in May. As you walk around the construction site under the scaffolding, you’ll find a series of E-shaped windows that let you peek into the construction activity happening on-site.

NorQuest Construction

You can follow along as construction of the Singhmar Centre for Learning progresses at the microsite. They’ve got a blog and are also on Twitter as @nqexpansion. As is the trend these days, NorQuest is working to create a timelapse of the construction so you can revisit the transformation once it is all done.

NorQuest is also celebrating its 50th anniversary in 2015 “with a year-long series of events and activities.”

UPDATE: Corrected to clarify that the Health Education Centre building will not remain as originally stated and will in fact be demolished.
UPDATE2: NorQuest has updated their microsite to say that the Province is providing $170 million, not $154 million as originally stated. I have updated the post accordingly.

Wireless at Red Deer College

Post ImageMy sister and I came down to Red Deer last night to visit Tom. He’s on the Kings soccer team, so we figured we’d come down to watch his game today. Today is the second last game of the season, and I think it’s fair to say that the Kings are looking forward to the end. After placing third in the province last year, they haven’t done so well this year! You can see the current standings here.

The game isn’t until noon, but I came down to the college with Tom this morning anyway. I figured I’d do a little work so I came to the library which is where I am writing this post. I am connected to their public wireless Internet network, and I have to say, I am really impressed. The speeds are just amazing for a wireless network, and I haven’t had any connectivity issues whatsoever. That’s far more than I can say about the wireless network at the UofA (granted, it has far more traffic than the one here).

I was so impressed actually, that I ran a speed test at DSL Reports:

When you convert those numbers, it works out to roughly 227 KB/sec download, and 90 KB/sec upload. Not bad at all. I wish all wireless hotspots were this good!

Kim and I are heading back to Edmonton this evening.

Old School 2

Post ImageOh man, I just can’t believe this. Well that’s not true, I can, I just can’t wait! Via Sharon, I got this link to the IMDB site with an entry for Old School 2! Yes, a sequel to one of the funniest movies I have ever seen. There information there is sparse, but Wikipedia has the goods:

Old School 2 is the announced sequel to Old School. This film will be made by DreamWorks SKG and will be distributed by Paramount Pictures. It is scheduled to be released some time in 2007.

That’s just the description though. The real goods are in the cast list they provide: Luke Wilson, Will Ferrell, Vince Vaughn, Jack Black, Ben Stiller, Owen Wilson, Steve Carrell, Elisha Cuthbert, Kathy Bates, and Christopher Walken.

Is that even possible? The Wikipedia entry has a warning that sources have not been cited, so take that list with a grain of salt, but still! That would be absolutely amazing! IMDB has the movie listed for a 2007 release. I hope it is correct.

Black van of death, Frank the tank, and all the other greatness that was Old School. Just imagine!

I wish IMDB had RSS feeds for movies, then I could easily see when the cast is updated.

Helping Kim Move

Post ImageHaven’t been around much the last couple days as I’ve been busy helping Kimmi move into residence at Grant MacEwan. It’s funny how you don’t realize just how much effort it takes, and just how much stuff you actually have. I don’t think I have ever owned as many clothes as Kim does right now!

The residence itself is very nice – minus the concrete floors that make your feet black. There is room for 900 students total in bachelor, two-bedroom and four-bedroom configurations, and the building is currently home to 600 students. I’d expect it to fill up pretty quickly though. Kim is in a two-bedroom, so she shares a bathroom and kitchenette with a roommate. They don’t have an oven, but they do have a stovetop and a microwave, and let’s be honest, you really only need a microwave anyway! You can see the pictures here.

There are some pretty strict rules about having guests and that sort of thing, so I am not sure how often I’ll actually be there. I also think it’s funny that they are only allowed to have 9 sleepovers per semester. What kind of number is that? Why not just make it an even ten? I don’t get it. At first I thought it was dumb to have such a rule at all, but then I remembered one of those facts of life that I look forward to one day when I am a father – you live under my roof, you live by my rules!

Read: Pictures